Overview
When creating Pay Rules in Astute, there are properties, conditions and actions. The Actions determine what will happen when certain rule conditions are met.
Rule Types
The rule type you have chosen under Properties will affect which action type you can choose.
| Manually Set on Timesheet |
| Assign Allowance |
Set a pay item or allowance on a timesheet that can then be manually chosen by the person completing it |
| Work Structure |
|
Minimum paid units
|
Set the minimum number of paid units that must be paid for a shift, a day or a timesheet
|
|
Assign set paid units
|
Set a fixed number of units that must be paid for a shift, a day or a timesheet
|
|
Minimum unpaid breaks
|
Set the minimum unpaid break length (in minutes) that must be assigned to a shift. If an employee enters a break on their timesheet the minimum unpaid break as well as the break entered on the timesheet will be deducted.
|
| Pay Condition |
| Assign Pay Item |
Assign a pay item (eg Base Hourly) to a time block
|
| Assign Allowance |
Assign an allowance to a time block
|
| Lock Time Block |
Lock a time block so that it cannot be affected or used by other rules
|
| Tag Time As |
Add a tag to a time block
|
| Flag in Pay Conditions As |
Add a visible 'Flag' to timesheets in Pay Conditions for items or conditions you want to highlight to Admin users
|
Attributes
The attributes are the details of what the action will do (eg which pay item it will assign, etc). The action type you have chosen will affect which attributes you can choose.
Action Types
| Rule Type |
Action Type |
Description |
Attributes |
| Manually Set on Timesheet |
Assign Allowance |
Add a manually selected pay item (eg meal allowance) to a timesheet. The pay item can then manually select the allowance for the matching units.
|
Pay Item
Rate
Charge Item
- Choose the charge item you want to invoice your customer for
- You can assign a specific charge item or use the pay item
|
Work Structure
|
Minimum paid units |
Assign a minimum number of units |
Units
Apply… Drop-down list
- Per Shift applies the minimum to the shift that meets the Conditions.
If there are multiple shifts that meet the condition this will apply to all of them individually
- Per Day applies the minimum to the sum of all shifts on the day
- Per Timesheet applies the minimum to the sum of all shifts on the entire timesheet
|
| Maximum paid units |
Restrict the number of units |
Units
Apply to… Drop-down list
- Per Shift applies the maximum to the shift that meets the Conditions.
If there are multiple shifts that meet the condition this will apply to all of them individually
- Per Day applies the maximum to the sum of all shifts on the day
- Per Timesheet applies the maximum to the sum of all shifts on the entire timesheet
|
Pay Conditions
|
Assign Pay Item |
Assign a pay item to the matching units. The difference between this action type and the Manually Set on Timesheet action type is that this action does not let user select the pay item or allowance on the timesheet. |
Pay Item drop-down list
- Choose the pay item you want to assign
Rate drop-down list
- Choose the pay rate you want to use for the assigned pay item
Charge Item drop-down list
- Choose the charge item you want to invoice your customers for
- You can assign a specific charge item or use the pay item
Apply to…drop-down list
- Apply to matched blocks only applies the pay item to the matching units
- Apply to all subsequent blocks applies the pay item to the matching units and all subsequent units recorded on the timesheet
Apply to all subsequent blocks can override a rule that has locked the matching units
- Apply to entire day applies the pay item to all shifts on the matching day.
- Apply to the entire Timesheet applies to pay item to all shifts on the timesheet
- Add as Extra Units allows you to add a specified number of units and to apply the pay item to those units
- This is useful if you need to apply a shift loading and want to do it as separate units
Multiplier drop-down list
- Where matching units can have more than none pay item assigned, the Multiplier lets you control how the pay items are applied
- Apply Maximum only applies the highest multiplier
- Apply Minimum only applies to the lowest multiplier
- Apply This applies the pay item irrespective of other/previous actions
- Apply all applies all multipliers
|
| Assign Allowance |
Assign an allowance to a shift. You can also use this action to assign other pay items, such as on call rates |
Pay Item drop-down list
- Choose the pay item you want to assign to the matching units
Rate drop-down list
- Choose the pay rate you want to use for the assigned pay item
Charge Item drop-down list
- Choose the charge item you want to invoice your customers for
Units Free-text field
- Enter the number of units of the pay item you want to assign.
Enter the units in decimal format (eg 2.5)
Repetition drop-down list
- The number of times you want to apply the allowance to the matching units
- Once only applies the allowance once per timesheet
- Per shift applies the allowance once per block of matching units
- Per unit worked (pro-rata) applies the allowance once per matching unit. Applies partial allowance to a partial unit (eg 0.5 of the allowance for 0.5 of a unit)
- Per unit worked (whole units only) rounds the matching units down to nearest whole number
- Per unit worked (or part of) rounds the matching units up to nearest whole number
- Per unit worked (rounded) rounds 0.00 to 0.49 of a unit down to nearest whole number and rounds 0.50 to 0.99 of a unit up to nearest whole number
|
| Tag Time As |
Assign a tag to the matching units. You need to pair this rule with a second rule that then does something with the tagged units |
Tag Free-text field
- Enter the tag you want to assign to the matching units
Apply to...drop-down list
- Apply to matched blocks only applies the Tag to the matching units
- Apply to all subsequent blocks applies the Tag to the matching units and all subsequent units recorded on the timesheet.
- Apply to entire Day applies the Tag to all shifts on that day
- Apply to entire Timesheet applies the Tag to all shifts on the timesheet
|
| Percentage Paid Units |
Allows you to convert units on the basis of a percentage of a set value.
Use this is if you need to convert hours into days.
|
Action
- 'Pay a percentage' of the matched units.
- The Rounding and Precision allow you to smooth out the units resulting from the percentage.
Percentage
- Free text field
- Enter the percentage you want to assign, in decimal format (eg 2.5)
Rounding
- 'Closest' - match to the closet precision point to the percentage
- 'Round Up' - match to the closest precision point greater than the percentage
- 'Round Down' - match to the closest precision point less than the percentage
Precision
- Free text field
- Enter the precision you wish to round to, in decimal format (eg 0.125)
|
Comments